Frame 5 Rotor Reconditioning and Rotor Life Assessment
Most large pulp and paper mills require vast amounts of reliable, base-load electric power. They also depend on steady high-temperature air and steam for their process operations. A large mill anticipated its current General Electric® Frame 5 gas turbine’s rotor would reach the end of its life cycle in 2024. A replacement would be needed. […]
Read More